INSTRUCTION MANUALINSTALLATION, COMMISSIONING & SERVICINGFLOOR STANDING OIL FIRED CONDENSING BOILER CONVENTIONALFLUE & ROOM SEALED FLUEGREENST
OIL SUPPLYINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)10PRE -INSTALLATIONOIL SUPP
WATER SYSTEMS & PIPEWORKINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)11PRE -IN
WATER SYSTEMS & PIPEWORKFILLING PRIMARY SEALED SYSTEMS:• Filling the system must comply with one of themethods shown opposite.• The filling point
CONDENSATE &PRESSURE RELIEF PIPEWORKINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/20
• This boiler is only suitable for installing internally within a property at a suitable location onto a fixed rigid surface of the samesize as the bo
600mm2250mm600mm2250mm600mm600mm radius750mm750mm2250mmm2250mBOILER LOCATION & CLEARANCESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER G
FLUE TERMINAL POSITIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)16PRE -INSTALL
PRE -INSTALLATIONCONVENTIONAL FLUEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)17C
ROOM SEALED FLUE OPTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)18PRE -INSTAL
UNPACKING THE BOILERINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)19INSTALLATIONUnp
INSTALLATION &SERVICING INSTRUCTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/20
SAFETY:All relevant safety precautions must be undertaken.Protective clothing, footwear, gloves and safetygoggles must be worn as appropriate.PIPEWORK
BOILER INSTALLATION1 Lift the top panel (A) upwards todisengage the ball stud connections (B) and remove.2 Remove the installation and literaturepac
The flue can exit the boiler from outlets A, B, Cor D allowing vertical (RS &CF) and horizontal(RS low or high level) flues to be fitted. (CFposit
Combustion chamber:1 Remove the retaining nuts and washers (B). Remove combustion chamber access door (A).2 Ensure the baffles (C) and baffle reta
PIPEWORK CONNECTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)24INSTALLATIONCAU
CAUTION: ISOLATE THE OIL & WATER MAINS SUPPLY BEFORE STARTING ANYWORK AND OBSERVE ALL RELEVANTSAFETY PRECAUTIONS.OIL BURNER:1 Check t
REFITTING COMPONENTS1 Slide side panels (R) and top support bracket (L) together with control box (G) along base rails and push to secure into the
ELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)27INSTALLATIONELECTRICSDANGE
MRESETWhiteELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)28INSTALLATIONELE
ELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)29INSTALLATIONELECTRICSDANGE
CONTENTSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)3SAFETY ®ULATIONSAPPLI
PRE-COMMISSIONING CHECKS -APPLIANCECAUTION: ISOLATE THE MAINS SUPPLIESBEFORE STARTING ANY WORK ANDOBSERVE ALL RELEVANT SAFETYPRECAUTIONS.1Check that
1 Open all system and radiator valves. Turn on the water main stop cock. Open vented systems only: Turn on the water to the system feed and expan
ABCABCA - Bleed & pressure gauge portB - Pressure adjustmentC - Vacuum gauge portD - Retaining screws - coverDDDANFOSSBFP 11 L3 OIL PUMPSUNTECAS47
ABCA - Bleed & pressure gauge portB - Pressure adjustment C - Vacuum gauge portDANFOSSBFP 11 L3 OIL PUMPABCSUNTECAS47C OIL PUMP%CO2NOMINAL BOILER
STARTING THE APPLIANCECentral heating:1Open all radiator valves.Set room thermostat to maximum.Set programmer to ON for CH, OFF forDHW (if applicab
WATER TREATMENTIMPORTANT: Debris from the system candamage the boiler and reduce efficiency. Failure to comply with the guidelines for the use of wate
FINISHING COMMISSIONING - APPLIANCE1 Slide control box (A) into the boiler. Secure with screws (B).2Align the top front panel (H) and push theball
INSPECTION AND SERVICECAUTION: ISOLATE THE WATER,ELECTRICITY AND OIL MAINS SUPPLIES BEFORE STARTING ANY WORK ANDOBSERVE ALL RELEVANT SAFETYPRECAUTIONS
1 Clean the Burner:Remove the air intake cover (H) and clear any debris from the air intake and air damper.Disassemble the burner to allow access to
1342HGIABCDEGFJKLMIFRONT INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C
SAFETY PRECAUTIONS& INSTALLATION REGULATIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256
INSPECTION AND SERVICEFire valve:Check that the oil supply pipe has a fire valvefitted externally to the building with the firevalve sensor located w
7 8 111312142 3 4 5 6 9 10 11516 17RIELLO RDB 2.2 burner SHORT PARTS LIST 18/251 Burner - Riello RDB 2.2 18/25Part Number: 8 718 685 836 0 2 Combust
1 789131415 161110122 3456171819 208aBENTONE Sterling 50 burnerSHORT PARTS LIST 18/251 Burner - Sterling 50Part Number: 8 716 108 570 02 Combustion he
FAULT FINDINGPROBLEM CAUSE REMEDYLOCKOUT:Pulsation on start CF - Flue draught incorrect CF - Check flue draughtCombustion settings incorrect Set up as
FAULT FINDINGPROBLEM CAUSE REMEDYFAULTY BOILEROPERATION:Noisy operation Pump noise from air in pump orworn pumpBleed air from pump or replace pumpWorn
RIELLO CONTROL BOX OPERATIONThis operation instruction is provided to assist competent and suitably qualified engineers tolocate and rectify faults. W
Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Lockoutwithin 1second?Replacecontrol boxReplacemotor/pumpCheck boilercontrols &s
Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Burnerlights immediatelymotor runs?230V atsolenoid coilin purge?Replacecontrol boxRe
BOILER MODEL SERIAL No.COMMISSIONING ENGINEER COMMISSIONING CHECKSCOMPANY NAME:PUMP PRESSURE(PSI):ADDRESS:
SERVICE 1DATEENGINEER NAMECOMPANY NAMETEL No.OFTEC REG No.PUMP PRESSURE: psi CO2%:NOZZLE CHANGED? YES NOF.G.T. °C
GENERAL INFORMATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)5APPLIANCEINFORMAT
NOTESNOTESNOTESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25 8 716 106 256C (03/2010)508 716 106 256 C 03.
NOTESNOTESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25 8 716 106 256C (03/2010)51NOTES8 716 106 256 C 03.
CONTACT INFORMATIONWORCESTER, BOSCH GROUP:TECHNICAL: 0844 892 3366SERVICE: 0844 892 3000SERVICE (EIRE): 01494 0099SPARES: 01905 752571LITERATURE: 0844
TECHNICAL DATAINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)6TECHNICAL DATACentral
LAYOUT & COMPONENTSThe diagram opposite excludes the top, frontand RH side casing panels.1 CONTROL BOX ASSEMBLY2 CASING SIDE PANEL3 FLUE
CLEANING PRIMARY SYSTEMSIMPORTANT: All the following Pre-Installation sections must be read and requirements met before starting boiler or flue insta
MAINS SUPPLYELECTRIC SUPPLY:• Supply: 230V - 50Hz.• Cable: PVC insulated 0.75mm2(24 x0.2mm) temperature rated to 90°C.• Protection IP20.• External