INSTRUCTION MANUAL
INSTALLATION, COMMISSIONING & SERVICING
FLOOR STANDING OIL FIRED CONDENSING BOILER CONVENTIONAL
FLUE & ROOM SEALED FLUE
GREENSTAR UTILITY
18/25
FOR FULLY PUMPED OPEN VENT OR SEALED CENTRAL HEATING SYSTEMS
AND DOMESTIC HOT WATER CYLINDERS
UK
THE APPLIANCE IS FOR USE WITH KEROSENE
(28 SECOND OIL) ONLY
8 716 106 256 C 03.10 30/3/10 14:24 Page 1
Seitenansicht 0
1 2 3 4 5 6 ... 51 52

Inhaltsverzeichnis

Seite 1 - GREENSTAR UTILITY

INSTRUCTION MANUALINSTALLATION, COMMISSIONING & SERVICINGFLOOR STANDING OIL FIRED CONDENSING BOILER CONVENTIONALFLUE & ROOM SEALED FLUEGREENST

Seite 2 - SERVICING INSTRUCTIONS

OIL SUPPLYINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)10PRE -INSTALLATIONOIL SUPP

Seite 3 - CONTENTS

WATER SYSTEMS & PIPEWORKINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)11PRE -IN

Seite 4

WATER SYSTEMS & PIPEWORKFILLING PRIMARY SEALED SYSTEMS:• Filling the system must comply with one of themethods shown opposite.• The filling point

Seite 5 - Check List

CONDENSATE &PRESSURE RELIEF PIPEWORKINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/20

Seite 6 - TECHNICAL DATA

• This boiler is only suitable for installing internally within a property at a suitable location onto a fixed rigid surface of the samesize as the bo

Seite 7 - LAYOUT & COMPONENTS

600mm2250mm600mm2250mm600mm600mm radius750mm750mm2250mmm2250mBOILER LOCATION & CLEARANCESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER G

Seite 8 - CLEANING PRIMARY SYSTEMS

FLUE TERMINAL POSITIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)16PRE -INSTALL

Seite 9 - MAINS SUPPLY

PRE -INSTALLATIONCONVENTIONAL FLUEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)17C

Seite 10 - OIL SUPPLY

ROOM SEALED FLUE OPTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)18PRE -INSTAL

Seite 11 - WATER SYSTEMS & PIPEWORK

UNPACKING THE BOILERINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)19INSTALLATIONUnp

Seite 12

INSTALLATION &SERVICING INSTRUCTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/20

Seite 13 - PRESSURE RELIEF PIPEWORK

SAFETY:All relevant safety precautions must be undertaken.Protective clothing, footwear, gloves and safetygoggles must be worn as appropriate.PIPEWORK

Seite 14 - 8 716 106 256C (03/2010)

BOILER INSTALLATION1 Lift the top panel (A) upwards todisengage the ball stud connections (B) and remove.2 Remove the installation and literaturepac

Seite 15 - CLEARANCES

The flue can exit the boiler from outlets A, B, Cor D allowing vertical (RS &CF) and horizontal(RS low or high level) flues to be fitted. (CFposit

Seite 16 - FLUE TERMINAL POSITIONS

Combustion chamber:1 Remove the retaining nuts and washers (B). Remove combustion chamber access door (A).2 Ensure the baffles (C) and baffle reta

Seite 17 - CONVENTIONAL FLUE

PIPEWORK CONNECTIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)24INSTALLATIONCAU

Seite 18 - ROOM SEALED FLUE OPTIONS

CAUTION: ISOLATE THE OIL & WATER MAINS SUPPLY BEFORE STARTING ANYWORK AND OBSERVE ALL RELEVANTSAFETY PRECAUTIONS.OIL BURNER:1 Check t

Seite 19 - UNPACKING THE BOILER

REFITTING COMPONENTS1 Slide side panels (R) and top support bracket (L) together with control box (G) along base rails and push to secure into the

Seite 20 - FLUE OPENING

ELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)27INSTALLATIONELECTRICSDANGE

Seite 21 - BOILER INSTALLATION

MRESETWhiteELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)28INSTALLATIONELE

Seite 22 - FLUE INSTALLATION

ELECTRICSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)29INSTALLATIONELECTRICSDANGE

Seite 23 - COMBUSTION CHAMBER

CONTENTSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)3SAFETY &REGULATIONSAPPLI

Seite 24 - PIPEWORK CONNECTIONS

PRE-COMMISSIONING CHECKS -APPLIANCECAUTION: ISOLATE THE MAINS SUPPLIESBEFORE STARTING ANY WORK ANDOBSERVE ALL RELEVANT SAFETYPRECAUTIONS.1Check that

Seite 25 - OIL BURNER & PUMP

1 Open all system and radiator valves. Turn on the water main stop cock. Open vented systems only:  Turn on the water to the system feed and expan

Seite 26 - REFITTING COMPONENTS

ABCABCA - Bleed & pressure gauge portB - Pressure adjustmentC - Vacuum gauge portD - Retaining screws - coverDDDANFOSSBFP 11 L3 OIL PUMPSUNTECAS47

Seite 27 - ELECTRICS

ABCA - Bleed & pressure gauge portB - Pressure adjustment C - Vacuum gauge portDANFOSSBFP 11 L3 OIL PUMPABCSUNTECAS47C OIL PUMP%CO2NOMINAL BOILER

Seite 28

STARTING THE APPLIANCECentral heating:1Open all radiator valves.Set room thermostat to maximum.Set programmer to ON for CH, OFF forDHW (if applicab

Seite 29

WATER TREATMENTIMPORTANT: Debris from the system candamage the boiler and reduce efficiency. Failure to comply with the guidelines for the use of wate

Seite 30 - APPLIANCE

FINISHING COMMISSIONING - APPLIANCE1 Slide control box (A) into the boiler. Secure with screws (B).2Align the top front panel (H) and push theball

Seite 31 - FILLING THE SYSTEM

INSPECTION AND SERVICECAUTION: ISOLATE THE WATER,ELECTRICITY AND OIL MAINS SUPPLIES BEFORE STARTING ANY WORK ANDOBSERVE ALL RELEVANT SAFETYPRECAUTIONS

Seite 32 - STARTING THE APPLIANCE

1 Clean the Burner:Remove the air intake cover (H) and clear any debris from the air intake and air damper.Disassemble the burner to allow access to

Seite 33

1342HGIABCDEGFJKLMIFRONT INSPECTION AND SERVICEINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C

Seite 34

SAFETY PRECAUTIONS& INSTALLATION REGULATIONSINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256

Seite 35 - WATER TREATMENT

INSPECTION AND SERVICEFire valve:Check that the oil supply pipe has a fire valvefitted externally to the building with the firevalve sensor located w

Seite 36 - FINISHING COMMISSIONING

7 8 111312142 3 4 5 6 9 10 11516 17RIELLO RDB 2.2 burner SHORT PARTS LIST 18/251 Burner - Riello RDB 2.2 18/25Part Number: 8 718 685 836 0 2 Combust

Seite 37 - INSPECTION AND SERVICE

1 789131415 161110122 3456171819 208aBENTONE Sterling 50 burnerSHORT PARTS LIST 18/251 Burner - Sterling 50Part Number: 8 716 108 570 02 Combustion he

Seite 38

FAULT FINDINGPROBLEM CAUSE REMEDYLOCKOUT:Pulsation on start CF - Flue draught incorrect CF - Check flue draughtCombustion settings incorrect Set up as

Seite 39

FAULT FINDINGPROBLEM CAUSE REMEDYFAULTY BOILEROPERATION:Noisy operation Pump noise from air in pump orworn pumpBleed air from pump or replace pumpWorn

Seite 40

RIELLO CONTROL BOX OPERATIONThis operation instruction is provided to assist competent and suitably qualified engineers tolocate and rectify faults. W

Seite 41 - RIELLO RDB 2.2 - 18/25

Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Lockoutwithin 1second?Replacecontrol boxReplacemotor/pumpCheck boilercontrols &s

Seite 42 - BENTONE 50 - 18

Boiler notoperatingwith aheating /hot waterdemandBurnermotor runs?Burnerlights immediatelymotor runs?230V atsolenoid coilin purge?Replacecontrol boxRe

Seite 43 - FAULT FINDING

BOILER MODEL SERIAL No.COMMISSIONING ENGINEER COMMISSIONING CHECKSCOMPANY NAME:PUMP PRESSURE(PSI):ADDRESS:

Seite 44

SERVICE 1DATEENGINEER NAMECOMPANY NAMETEL No.OFTEC REG No.PUMP PRESSURE: psi CO2%:NOZZLE CHANGED? YES NOF.G.T. °C

Seite 45 - CONTROL BOX OPERATION

GENERAL INFORMATIONINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)5APPLIANCEINFORMAT

Seite 46 - RIELLO CONTROL BOXES

NOTESNOTESNOTESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25 8 716 106 256C (03/2010)508 716 106 256 C 03.

Seite 47 - SATRONIC CONTROL BOX

NOTESNOTESINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/25 8 716 106 256C (03/2010)51NOTES8 716 106 256 C 03.

Seite 48 - SERVICE INTERVAL RECORD

CONTACT INFORMATIONWORCESTER, BOSCH GROUP:TECHNICAL: 0844 892 3366SERVICE: 0844 892 3000SERVICE (EIRE): 01494 0099SPARES: 01905 752571LITERATURE: 0844

Seite 49

TECHNICAL DATAINSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR DANESMOOR UTILITY 18/258 716 106 256C (03/2010)6TECHNICAL DATACentral

Seite 50

LAYOUT & COMPONENTSThe diagram opposite excludes the top, frontand RH side casing panels.1 CONTROL BOX ASSEMBLY2 CASING SIDE PANEL3 FLUE

Seite 51

CLEANING PRIMARY SYSTEMSIMPORTANT: All the following Pre-Installation sections must be read and requirements met before starting boiler or flue insta

Seite 52 - CONTACT INFORMATION

MAINS SUPPLYELECTRIC SUPPLY:• Supply: 230V - 50Hz.• Cable: PVC insulated 0.75mm2(24 x0.2mm) temperature rated to 90°C.• Protection IP20.• External